INTERIOR ARCHITECHURE
In some specific cases, Studiotech, structured as a multidisciplinary design office, develops the whole project: content and container in conjunction with the project manager and the project owner. We then erect your communication complex from the bare masonry walls to the finished room. A work of study, design, realisation, implementation and completion in conformity with the norms and rules in force including the following factors.
-
Calculation and implementation of the slow moving HVAC respecting user comfort and the emergence of sound NR
​
-
Study and installation of acoustic doors of attenuation class corresponding to the functionalities of the room to be soundproofed
​
-
Support for driving force, electricity and lighting including calculations, simulations of power and light consistency according to the room and its constraints
​
-
Concept and installation of pictograms, lighting and safety equipment
​
-
Definition, implementation, measures to be implemented to obtain the correct insulation and adequate acoustic treatment of the room
​
-
Implementation of selected materials for the floor, partitions, ceiling, etc.
​
-
Design and installation of floor coverings, armchairs and seats, furniture, tables, conference desks, lecterns, etc.
​
-
Implementation, commissioning of all techniques and their perfect integration
​
A turnkey solution in symbiosis with the customer, the architect and the prime contractor for the user.
Algeria Sonatrach TRC Haoud El Hamra Room Completed Room
Structural work Laying of steps and wall insulation, constitution of a plenum
Structural work Joists of the rear part, unevenness 3m50, 3 slopes, 3 axes of vision of the screen, front floor rail casting concrete footing
Structural work Contraband, start of HVAC installation by displacement, plenum drive
Structures Tiers, installation of air ducts on Hilti rail
HVAC Connection by isophonic hoses to main air ducts of clamshell boxes and mufflers
HVAC Clamshell boxes, mufflers and cable baskets, start of laying of seats with reservation for drive grille
HVAC Ceiling installation on Hilti rails of aeraulic ducts in air return plenum, metallic angle irons with acoustic insulation
Acoustics Wall brackets for acoustic insulation installation, prefabricated structure for acoustic absorbent installation in melamine foam and hooking of Laudescher finishing panels
Acoustics Prefabricated frames for absorbent melamine foam and wood panel hook Laudescher, open 20%
Acoustic Laudescher panels placed, melamine foam under transsonore fabric on the ceiling, tier with reservation for vents between the chairs
Electronics & IT Programming and GTC
Algeria Sonatrach TRC Haoud El Hamra Room completed
Acoustic insulation Integration of acoustic door class Ib, moucharabieh
Architecture Integration with the architecture desired by the client, carpet printed according to our drawings
Architecture Carpet according to our design, security lighting in the center of the arabesque
Interior architecture Room entrance Irara, Sonatrach Production Hassi Messaoud, respect for the local architecture
Interior design Carpet according to our design, security lighting in the center of the floral motif
Security Signaling
Security Integration of techniques, room of 24 February, Hassi Messaou
Security Integration of techniques: hydran, TRC Haoud El Hamra
Algeria Hotel El-Aurassi Integration of techniques in Algiers
Algeria Hotel El-Aurassi Integration of techniques in Algiers
Algeria National Defense Integration of the General Staff of the Air Forces in Cheraga